The Parade Major Refurbishment

Location:

Norwood

Cost:

$0.7M

One team. One vision.
Total project certainty.

Project Brief

This retail project involves the complete strip-out of an existing, tired building and the construction of a new rear addition. The leasing logic did a lot of the heavy lifting: determining what was to be preserved and what was to be removed. The design responds directly to tight site constraints, floodplain requirements and interfacing of new works with the original. A cost-effective structural solution was developed to overcome site access limitations and to maximise on in-situ architectural features—including an exposed timber trussed ceiling and an atrium that pushes natural light into the interior.

Key Considerations

  • Balancing competing operational and regulatory requirements
  • Compliance upgrades for accessibility, services, fire safety and building codes
  • Integrating new construction with the existing building while addressing site constraints
  • Close coordination with building services and all stakeholders for a restaurant tenant
  • Delivering a buildable and cost-effective structural solution on a dense urban site with limited access
  • Coordinating tenancy requirements and alignment throughout with base building design and construction