Inghams Processing Facilities

Location:

Various

Date:

2022 to 2024

One team. One vision.
Total project certainty.

Project Brief

These purpose-built facilities support modern poultry processing and distribution operations, combining advanced manufacturing, cold storage and logistics functions within a highly efficient industrial environment. The design balances operational performance, food safety and sustainability, creating a facility capable of supporting high production volumes while responding to evolving industry standards and market demand.

The locations of this project varied over different parts:

Sommerville Freezing Facility 2024
Pet Block Freezing Facility 2023
Blood Tanker 2022
IT Data Cabinets Edinburgh Park 2024

Key Considerations

  • Integrating processing, packaging and cold storage operations within a production environment
  • Coordinating complex building services including HVAC and refrigeration within a controlled environment
  • Meeting stringent food safety, hygiene and biosecurity requirements
  • Designing for high-volume logistics, heavy vehicle movements and efficient product distribution
  • Managing energy efficiency and sustainability objectives within refrigeration-intensive facilities
  • Designing in accordance with standardised food brand processing and operational requirements

Further info: more information