Golden Grove Medical Centre

Location:

Golden Grove

Date:

2025

Cost:

$10.0M

One team. One vision.
Total project certainty.

Project Brief

Two-storey retail development.

Key Considerations

  • Engineering structural floor system to support sensitive medical equipment
  • Engineering foundation system for controlled fill conditions 
  • Long-span steel floor beams utilised to reduce internal columns to improve spatial flexibility and optimise structural efficiency
  • Developing structural framing to support architectural features and maintain performance