Eyre Trading Commercial Development

Location:

Port Augusta

Date:

2025

Cost:

$2.0M

One team. One vision.
Total project certainty.

Project Brief

This bulky-goods retail store and associated retail and warehouses (4 tenancies) support efficient freight handling, storage and distribution operations within a robust logistics environment. The development incorporates expansive warehouse space, high-clearance storage areas, loading and dispatch facilities and integrated building services to enable future-focused operations. A key aspect was managing complex site access requirements, including a long access route from the rear and controlled vehicle egress onto the main highway in accordance with DIT requirements.

Key Considerations

  • Managing complex approvals with authorities
  • Engineering for heavy and varied racking loads
  • Engineering for large internal spans for flexible layout
  • Integrating structural allowances for services provisions
  • Designing for durability and robustness due to goods handling
  • Designing for future expansion
  • Coordinating tenancy requirements with base building design and construction