Location:

North Plympton

Date:

2024

Cost:

$3.5M

One team. One vision.
Total project certainty.

Project Brief

This project delivers a PC2 laboratory and product testing suite for advanced research, high-performance and future-readiness. Designed for technical performance and long-term operational flexibility, the facility incorporates a flexible equipment layout and configurable testing environments to support evolving research requirements. Designed to be robust- it integrates specialist ventilation, HVAC, fire protection, electrical infrastructure, safety systems and cold storage within a controlled environment. The project demonstrates our ability to deliver complex and highly regulated facilities where design and technical performance are seamlessly integrated.

Key Considerations

  • Optimising workflow efficiency and circulation
  • Minimising cross-contamination and maintaining safety compliance
  • Ensuring flexible and modular spatial planning
  • Complex fire and safety requirements
  • Engineering robust infrastructure for temperature control and secure data systems
  • Engineering for high floor loads, vibration control and clear spans/heights
  • Mixed structural systems to improve cost efficiency

Further information: click here and here

Related Projects